contractual requirement造句
例句與造句
- To fully comply with environmental legislation by ensuring that estimates and contractual requirements reflect the statutory and designed environmental requirements
遵守有關(guān)保護(hù)環(huán)境的法例,確保工程符合環(huán)保法例的規(guī)定。 - To be responsible for co - ordinating , monitoring and managing the jv company projects activities and to ensure timely execution of the projects in accordance with the contractual requirements
負(fù)責(zé)協(xié)調(diào)、監(jiān)控、管理合資公司承接的項(xiàng)目,確保準(zhǔn)時(shí)按照合同要求完成項(xiàng)目。 - In order to provide documentation to satisfy the needs and expectations of interested parties management should consider contractual requirements from the customer and other interested parties
為使文件滿足相關(guān)方的需求和期望,管理者應(yīng)當(dāng)考慮顧客和其他相關(guān)方的合同要求 - A concession is defined as an acceptance , by the owner of a deviation from specified requirements identified prior to or during fabrication that such a concession does not violate statutory requirements or other contractual requirements
特許權(quán)是業(yè)主在不違反法律和其他合同條例的前提下,所設(shè)定的對所指定的特定條款的編制前或編制過程中所產(chǎn)生的偏差的接受范圍 - Although this does not constitute fly tipping , the contractor has breached the contractual requirement to transport c & d materials such as mud and crushed stones to a designated public filling area for disposal under the trip ticket system ( the system )
雖然,這并不構(gòu)成違法傾倒,但有關(guān)的承建商并沒有遵守合約中運(yùn)載記錄制度的規(guī)定把拆建物料(例如泥和碎石)卸置到指定的公眾填土區(qū)。 - It's difficult to find contractual requirement in a sentence. 用contractual requirement造句挺難的
- Condition which recognises to a supplier the competence to supply specific product typologies or product series , according to contractual requirements , which direct delivery to production departments , except for checks about certifying documentation and / or sporadic checks depending on coded criteria
根據(jù)合同的要求,認(rèn)可供應(yīng)商是否具有生產(chǎn)具體某種生產(chǎn)類型或某個(gè)系列的能力的條款,會(huì)直接送到產(chǎn)品部分,除了一些證明的文件及零部件的檢驗(yàn)標(biāo)準(zhǔn)。 - Where the developer fails to provide raw materials , equipment , site , funds , or technical information at the prescribed time and in accordance with the contractual requirements , the contractor may extend the relevant project milestones , and is entitled to claim damages for work stoppage or slowdown , etc
第二百八十三條發(fā)包人未按照約定的時(shí)間和要求提供原材料、設(shè)備、場地、資金、技術(shù)資料的,承包人可以順延工程日期,并有權(quán)要求賠償停工、窩工等損失。 - The provisional construction industry co - ordination board ( pcicb ) launched the voluntary sub - contractor registration scheme in november 2003 . with effect from august this year , the government has made it a contractual requirement for the contractors of public works contracts to engage sub - contractors registered under the scheme
臨時(shí)建造業(yè)統(tǒng)籌委員會(huì)于去年11月推出非強(qiáng)制性分包商注冊制度,而本局由本年8月起要求公共工程承建商在合約內(nèi),必需聘用經(jīng)該制度注冊的分包商。 - Kcrc will adopt robust measures to mitigate the noise impact . these will include stringent contractual requirements for use of the quietest equipment available , confining noisy works to daytime , dividing the site into small work zones , not allowing noisy equipment to work at the same time in adjacent zones and installing decking under which noisy work can be shielded from the public
這些措施包括:于合約內(nèi)嚴(yán)格規(guī)定承建商使用最寧靜的機(jī)器進(jìn)行工程;限制高噪音工程只能于日間進(jìn)行;把工地劃分成多個(gè)小區(qū);規(guī)定高噪音機(jī)器不可于相連的小區(qū)同時(shí)使用;以及在坑道上蓋上鐵板,以阻隔噪音。